ITAC Assessment: TN0497
ITAC logo
ITAC Assessment: TN0497
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1993
Principal Product Plastic food containers
NAICS
n/a
SIC 3714: Motor Vehicle Parts and Accessories
Sales Range $10
M
to 50
M
# of Employees 430
Plant Area 120,000
ft2
Annual Production 31,000,000
lb
Production Hrs. Annual 8,400
hrs
Location (State) Kentucky

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,085,204 26,118,992
kWh
Natural Gas $10,310 2,946
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $32,330 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $24,668

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.2511: Insulate bare equipment $13,208 $375 $13,208
314,478
kWh
02 2.4111: Utilize energy-efficient belts and other improved mechanisms $11,460 $3,241 $11,460
272,860
kWh
03 2.4231: Reduce the pressure of compressed air to the minimum required $3,201 - $3,201
76,202
kWh
04 2.4221: Install compressor air intakes in coolest locations $2,228 $1,370 $2,228
53,048
kWh
05 2.7142: Utilize higher efficiency lamps and/or ballasts $1,194 $914 $1,194
28,429
kWh
06 2.7111: Reduce illumination to minimum necessary levels $1,039 $800 $1,039
21,102
kWh
TOTAL RECOMMENDED $32,330 $6,700 $32,330
766,119
kWh
TOTAL IMPLEMENTED $24,668 $3,616 $24,668
587,338
kWh
Yearly Savings* Imp'd Cost* Electricity Usage Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs