ITAC Assessment: TN0486
ITAC logo
ITAC Assessment: TN0486
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1993
Principal Product Plastic Molded Houseware Products
NAICS
n/a
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $5
M
to 10
M
# of Employees 160
Plant Area 220,000
ft2
Annual Production 6,000,000
pieces
Production Hrs. Annual 6,000
hrs
Location (State) Tennessee

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $304,868 6,253,810
kWh
Natural Gas $43,268 8,508
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $20,016 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $3,431

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.2511: Insulate bare equipment $7,295 $825 $7,295
148,886
kWh
02 2.7111: Reduce illumination to minimum necessary levels $7,655 - $7,655
156,213
kWh
03 2.2511: Insulate bare equipment $2,054 $2,900 $2,054
41,911
kWh
04 2.4221: Install compressor air intakes in coolest locations $1,089 $590 $1,089
23,154
kWh
05 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,032 $100 $1,032
21,102
kWh
06 2.6212: Turn off equipment during breaks, reduce operating time $546 $890 $546
11,137
kWh
07 2.7142: Utilize higher efficiency lamps and/or ballasts $345 $576 $345
7,034
kWh
TOTAL RECOMMENDED $20,016 $5,881 $20,016
409,437
kWh
TOTAL IMPLEMENTED $3,431 $3,576 $3,431
70,047
kWh
Yearly Savings* Imp'd Cost* Electricity Usage Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs