ITAC Assessment: TN0480
ITAC logo
ITAC Assessment: TN0480
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1993
Principal Product Hydraulic support systems for underground mines
NAICS
n/a
SIC 3532: Mining Machinery and Equipment, Except Oil and Gas Field Machinery and Equipment
Sales Range $10
M
to 50
M
# of Employees 75
Plant Area 46,000
ft2
Annual Production 7
pieces
Production Hrs. Annual 3,146
hrs
Location (State) Virginia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $58,815 1,004,103
kWh
Natural Gas $15,974 2,966
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $8,759 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $1,613

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7447: Install vinyl strip / high speed / air curtain doors $1,042 $1,820 - $1,042
-
MMBtu
02 2.7111: Reduce illumination to minimum necessary levels $1,569 $480 $1,569
25,498
kWh
-
03 2.4111: Utilize energy-efficient belts and other improved mechanisms $986 $378 $986
16,706
kWh
-
04 2.4231: Reduce the pressure of compressed air to the minimum required $346 $1,020 $346
5,862
kWh
-
05 2.4314: Use synthetic lubricant $225 - $225
3,810
kWh
-
06 2.7231: Use radiant heater for spot heating $4,591 $9,200 $4,758
-
kWh
$(-167.0)
-
MMBtu
TOTAL RECOMMENDED $8,759 $12,898 $7,884
51,876
kWh
$875
-
MMBtu
TOTAL IMPLEMENTED $1,613 $2,840 $571
9,672
kWh
$1,042
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs