ITAC Assessment: TN0468
ITAC logo
ITAC Assessment: TN0468
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1992
Principal Product COLD FORGED STEEL FASTEN
NAICS
n/a
SIC 3452: Bolts, Nuts, Screws, Rivets, and Washers
Sales Range $10
M
to 50
M
# of Employees 317
Plant Area
n/a
Annual Production 107,862,000
pieces
Production Hrs. Annual 6,000
hrs
Location (State) Tennessee

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $279,455 5,671,454
kWh
Natural Gas $84,225 19,350
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $11,336 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $11,336

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.2122: Install / repair insulation on condensate lines $5,192 $2,180 - $5,192
-
MMBtu
-
02 2.4111: Utilize energy-efficient belts and other improved mechanisms $2,192 $1,720 $2,192
43,669
kWh
- -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $2,758 $728 $3,486
71,219
kWh
- $(-728.0)
04 2.7123: Keep lamps and reflectors clean $608 $120 $573
11,723
kWh
- $35
05 2.6211: Conserve energy by efficient use of vending machines $388 $720 $388
7,913
kWh
- -
06 2.2122: Install / repair insulation on condensate lines $198 $25 - $198
-
MMBtu
-
TOTAL RECOMMENDED $11,336 $5,493 $6,639
134,524
kWh
$5,390
-
MMBtu
$(-693.0)
TOTAL IMPLEMENTED $11,336 $5,493 $6,639
134,524
kWh
$5,390
-
MMBtu
$(-693.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs