| Assessment Year | 1992 |
|---|---|
| Principal Product | ALUMINUM ENGINE CASTINGS |
| NAICS |
n/a
|
| SIC | 3363: Aluminum Die-Castings |
| Sales Range | $10 M to 50M |
| # of Employees | 340 |
| Plant Area |
n/a
|
| Annual Production | 15,200,000
lb
|
| Production Hrs. Annual | 6,000
hrs
|
| Location (State) | Tennessee |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $948,566 | 18,284,877 |
kWh
|
$0.052 |
| Natural Gas | $831,959 | 170,670 |
MMBtu
|
$4.87 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $32,230 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $3,886 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.2136: Install / repair insulation on steam lines | $11,989 | $368 | - |
$11,989
-
MMBtu
|
- | |
| 02 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $15,393 | - |
$15,393
296,014
kWh
|
- | - | |
| 03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $3,886 | $210 |
$3,886
74,736
kWh
|
- | - | |
| 04 | 2.6211: Conserve energy by efficient use of vending machines | $518 | $1,015 |
$518
9,965
kWh
|
- | - | |
| 05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $444 | - |
$615
11,723
kWh
|
- | $(-171.0) | |
| TOTAL RECOMMENDED | $32,230 | $1,593 |
$20,412
392,438
kWh
|
$11,989
-
MMBtu
|
$(-171.0) | ||
| TOTAL IMPLEMENTED | $3,886 | $210 |
$3,886
74,736
kWh
|
- | - | ||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs