ITAC Assessment: TN0457
ITAC logo
ITAC Assessment: TN0457
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1992
Principal Product ALUMINUM ENGINE CASTINGS
NAICS
n/a
SIC 3363: Aluminum Die-Castings
Sales Range $10
M
to 50
M
# of Employees 340
Plant Area
n/a
Annual Production 15,200,000
lb
Production Hrs. Annual 6,000
hrs
Location (State) Tennessee

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $948,566 18,284,877
kWh
Natural Gas $831,959 170,670
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $32,230 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $3,886

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.2136: Install / repair insulation on steam lines $11,989 $368 - $11,989
-
MMBtu
-
02 2.4111: Utilize energy-efficient belts and other improved mechanisms $15,393 - $15,393
296,014
kWh
- -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,886 $210 $3,886
74,736
kWh
- -
04 2.6211: Conserve energy by efficient use of vending machines $518 $1,015 $518
9,965
kWh
- -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $444 - $615
11,723
kWh
- $(-171.0)
TOTAL RECOMMENDED $32,230 $1,593 $20,412
392,438
kWh
$11,989
-
MMBtu
$(-171.0)
TOTAL IMPLEMENTED $3,886 $210 $3,886
74,736
kWh
- -