ITAC Assessment: TN0423
ITAC logo
ITAC Assessment: TN0423
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1991
Principal Product ROUGH-CUT LUMBER
NAICS
n/a
SIC 2421: Sawmills and Planing Mills, General
Sales Range $1
M
to 5
M
# of Employees 21
Plant Area
n/a
Annual Production 12,500
thousand feet
Production Hrs. Annual 2,250
hrs
Location (State) Kentucky

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $48,102 319,461
kWh
Natural Gas $12,200 2,634
MMBtu
Wood $25,000 688,000
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $244,249 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.3414: Burn waste to produce steam to drive a steam turbine generator set and use steam exhaust for heat $224,192 - $211,992
3,597,304
kWh
$12,200
-
MMBtu
02 2.4111: Utilize energy-efficient belts and other improved mechanisms $5,443 $2,415 $5,443
36,049
kWh
-
03 2.6211: Conserve energy by efficient use of vending machines $974 $285 $974
6,448
kWh
-
04 2.6212: Turn off equipment during breaks, reduce operating time $310 - $310
2,052
kWh
-
05 2.3191: Use demand controller or load shedder $8,200 $13,500 $8,200
-
kWh
-
06 2.3131: Reschedule plant operations or reduce load to avoid peaks $5,130 - $5,130
-
kWh
-
TOTAL RECOMMENDED $244,249 $16,200 $232,049
3,641,853
kWh
$12,200
-
MMBtu
TOTAL IMPLEMENTED - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs