ITAC Assessment: TN0420
ITAC logo
ITAC Assessment: TN0420
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1991
Principal Product SPORTING APPAREL
NAICS
n/a
SIC 2329: Men's and Boys' Clothing, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 400
Plant Area
n/a
Annual Production 51,000,000
pieces
Production Hrs. Annual 4,845
hrs
Location (State) Tennessee

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $279,952 5,007,913
kWh
Natural Gas $18,646 5,831
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $66,581 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $66,581

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.7221: Lower temperature during the winter season and vice-versa $25,653 - $25,653
458,089
kWh
- -
02 2.7123: Keep lamps and reflectors clean $21,120 - $15,891
283,411
kWh
- $5,229
03 2.7226: Use computer programs to optimize hvac performance $13,672 $5,600 $13,672
244,138
kWh
- -
04 2.4227: Use compressor air filters $2,380 $50 $2,380
42,497
kWh
- -
05 2.2437: Recover waste heat from equipment $330 $980 - $330
-
MMBtu
-
06 2.7142: Utilize higher efficiency lamps and/or ballasts $2,064 $3,176 $2,064
36,928
kWh
- -
07 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $492 $150 $492
8,792
kWh
- -
08 2.4231: Reduce the pressure of compressed air to the minimum required $460 $832 $460
8,206
kWh
- -
09 2.6212: Turn off equipment during breaks, reduce operating time $328 - $328
5,862
kWh
- -
10 2.2122: Install / repair insulation on condensate lines $82 $50 $82
1,465
kWh
- -
TOTAL RECOMMENDED $66,581 $10,838 $61,022
1,089,388
kWh
$330
-
MMBtu
$5,229
TOTAL IMPLEMENTED $66,581 $10,838 $61,022
1,089,388
kWh
$330
-
MMBtu
$5,229
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs