ITAC Assessment: TN0415
ITAC logo
ITAC Assessment: TN0415
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1990
Principal Product PATTERNED FABRIC & TRIM
NAICS
n/a
SIC 2311: Men's and Boys' Suits, Coats, and Overcoats
Sales Range $10
M
to 50
M
# of Employees 300
Plant Area
n/a
Annual Production 28,000,000
pieces
Production Hrs. Annual 6,204
hrs
Location (State) Tennessee

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $262,886 4,152,990
kWh
Natural Gas $64,390 15,096
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $50,853 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $49,003

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.7123: Keep lamps and reflectors clean $35,067 $44,200 $32,187
510,844
kWh
- $2,880
02 2.7142: Utilize higher efficiency lamps and/or ballasts $9,195 $9,000 $9,195
145,955
kWh
- -
03 2.2136: Install / repair insulation on steam lines $2,507 $2,445 - $2,507
-
MMBtu
-
04 2.1233: Analyze flue gas for proper air/fuel ratio $1,850 $1,500 - $1,850
-
MMBtu
-
05 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,976 - $1,976
31,360
kWh
- -
06 2.2122: Install / repair insulation on condensate lines $258 $150 - $258
-
MMBtu
-
TOTAL RECOMMENDED $50,853 $57,295 $43,358
688,159
kWh
$4,615
-
MMBtu
$2,880
TOTAL IMPLEMENTED $49,003 $55,795 $43,358
688,159
kWh
$2,765
-
MMBtu
$2,880
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs