ITAC Assessment: TN0411
ITAC logo
ITAC Assessment: TN0411
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1990
Principal Product HOSIERY
NAICS
n/a
SIC 2252: Hosiery, Not Elsewhere Classified
Sales Range $5
M
to 10
M
# of Employees 200
Plant Area
n/a
Annual Production 12,000,000
pieces
Production Hrs. Annual 6,000
hrs
Location (State) Tennessee

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $113,235 1,844,666
kWh
Natural Gas $25,947 5,186
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $8,466 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $5,789

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.2136: Install / repair insulation on steam lines $1,200 $475 - $1,200
-
MMBtu
02 2.4231: Reduce the pressure of compressed air to the minimum required $2,431 - $2,431
39,859
kWh
-
03 2.2437: Recover waste heat from equipment $681 $1,850 - $681
-
MMBtu
04 2.2135: Repair and eliminate steam leaks $429 $190 - $429
-
MMBtu
05 2.7142: Utilize higher efficiency lamps and/or ballasts $1,377 $354 $1,377
22,567
kWh
-
06 2.6212: Turn off equipment during breaks, reduce operating time $948 - $948
15,533
kWh
-
07 2.2122: Install / repair insulation on condensate lines $211 $482 - $211
-
MMBtu
08 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $626 $210 $626
10,258
kWh
-
09 2.6212: Turn off equipment during breaks, reduce operating time $317 - $317
5,275
kWh
-
10 2.6212: Turn off equipment during breaks, reduce operating time $246 $635 $246
4,103
kWh
-
TOTAL RECOMMENDED $8,466 $4,196 $5,945
97,595
kWh
$2,521
-
MMBtu
TOTAL IMPLEMENTED $5,789 $3,561 $3,268
53,633
kWh
$2,521
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs