Assessment Year | 1989 |
---|---|
Principal Product | TENNIS & RACQUET BALLS |
NAICS |
n/a
|
SIC | 3949: Sporting and Athletic Goods, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 450 |
Plant Area |
n/a
|
Annual Production | 60,000,000
pieces
|
Production Hrs. Annual | 5,760
hrs
|
Location (State) | South Carolina |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $750,119 | 15,021,102 |
kWh
|
$0.050 |
Natural Gas | $211,450 | 55,493 |
MMBtu
|
$3.81 |
Fuel Oil #6 | $282,512 | 114,912 |
MMBtu
|
$2.46 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $87,833 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $84,829 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Fuel Oil #6 Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.2414: Use waste heat from hot flue gases to preheat | $11,074 | $22,940 | - |
$4,757
-
MMBtu
|
$6,317
-
MMBtu
|
- | |
02 | 2.1233: Analyze flue gas for proper air/fuel ratio | $41,715 | $16,000 | - |
$17,925
-
MMBtu
|
$23,790
-
MMBtu
|
- | |
03 | 2.2135: Repair and eliminate steam leaks | $3,266 | $550 | - |
$1,433
-
MMBtu
|
$1,833
-
MMBtu
|
- | |
04 | 2.2136: Install / repair insulation on steam lines | $2,833 | $826 | - |
$1,243
-
MMBtu
|
$1,590
-
MMBtu
|
- | |
05 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $11,972 | $750 |
$11,972
239,449
kWh
|
- | - | - | |
06 | 2.7123: Keep lamps and reflectors clean | $13,017 | $9,388 |
$10,961
219,226
kWh
|
- | - | $2,056 | |
07 | 2.4312: Improve lubrication practices | $3,004 | - |
$3,004
60,082
kWh
|
- | - | - | |
08 | 2.6232: Install set-back timers | $865 | $1,300 |
$865
17,292
kWh
|
- | - | - | |
09 | 2.2122: Install / repair insulation on condensate lines | $87 | $180 | - |
$38
-
MMBtu
|
$49
-
MMBtu
|
- | |
TOTAL RECOMMENDED | $87,833 | $51,934 |
$26,802
536,049
kWh
|
$25,396
-
MMBtu
|
$33,579
-
MMBtu
|
$2,056 | ||
TOTAL IMPLEMENTED | $84,829 | $51,934 |
$23,798
475,967
kWh
|
$25,396
-
MMBtu
|
$33,579
-
MMBtu
|
$2,056 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Fuel Oil #6 Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs