ITAC Assessment: TN0384
ITAC logo
ITAC Assessment: TN0384
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1989
Principal Product TENNIS & RACQUET BALLS
NAICS
n/a
SIC 3949: Sporting and Athletic Goods, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 450
Plant Area
n/a
Annual Production 60,000,000
pieces
Production Hrs. Annual 5,760
hrs
Location (State) South Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $750,119 15,021,102
kWh
Natural Gas $211,450 55,493
MMBtu
Fuel Oil #6 $282,512 114,912
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $87,833 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $84,829

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Fuel Oil #6 Savings Administrative Changes Savings
01 2.2414: Use waste heat from hot flue gases to preheat $11,074 $22,940 - $4,757
-
MMBtu
$6,317
-
MMBtu
-
02 2.1233: Analyze flue gas for proper air/fuel ratio $41,715 $16,000 - $17,925
-
MMBtu
$23,790
-
MMBtu
-
03 2.2135: Repair and eliminate steam leaks $3,266 $550 - $1,433
-
MMBtu
$1,833
-
MMBtu
-
04 2.2136: Install / repair insulation on steam lines $2,833 $826 - $1,243
-
MMBtu
$1,590
-
MMBtu
-
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $11,972 $750 $11,972
239,449
kWh
- - -
06 2.7123: Keep lamps and reflectors clean $13,017 $9,388 $10,961
219,226
kWh
- - $2,056
07 2.4312: Improve lubrication practices $3,004 - $3,004
60,082
kWh
- - -
08 2.6232: Install set-back timers $865 $1,300 $865
17,292
kWh
- - -
09 2.2122: Install / repair insulation on condensate lines $87 $180 - $38
-
MMBtu
$49
-
MMBtu
-
TOTAL RECOMMENDED $87,833 $51,934 $26,802
536,049
kWh
$25,396
-
MMBtu
$33,579
-
MMBtu
$2,056
TOTAL IMPLEMENTED $84,829 $51,934 $23,798
475,967
kWh
$25,396
-
MMBtu
$33,579
-
MMBtu
$2,056
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Fuel Oil #6 Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs