Assessment Year | 1989 |
---|---|
Principal Product | ELECTRIC MOTORS |
NAICS |
n/a
|
SIC | 3621: Motors and Generators |
Sales Range | $10 M to 50M |
# of Employees | 200 |
Plant Area |
n/a
|
Annual Production | 13,000,000
pieces
|
Production Hrs. Annual | 7,488
hrs
|
Location (State) | North Carolina |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $142,354 | 2,388,335 |
kWh
|
$0.060 |
Fuel Oil #2 | $11,000 | 2,660 |
MMBtu
|
$4.14 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $46,869 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $5,768 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|
01 | 2.7123: Keep lamps and reflectors clean | $21,317 | $21,317 |
$20,856
347,597
kWh
|
$461 | |
02 | 2.7133: Use separate switches on perimeter lighting which may be turned off when natural light is available | $16,038 | $16,040 |
$16,038
267,292
kWh
|
- | |
03 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $2,515 | $1,800 |
$2,515
41,911
kWh
|
- | |
04 | 2.2511: Insulate bare equipment | $2,726 | $262 |
$2,726
45,428
kWh
|
- | |
05 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,846 | $120 |
$1,846
30,774
kWh
|
- | |
06 | 2.7243: Improve air circulation with destratification fans / other methods | $1,020 | $4,820 |
$1,020
16,999
kWh
|
- | |
07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $739 | $528 |
$739
12,309
kWh
|
- | |
08 | 2.4312: Improve lubrication practices | $668 | $300 |
$668
11,137
kWh
|
- | |
TOTAL RECOMMENDED | $46,869 | $45,187 |
$46,408
773,447
kWh
|
$461 | ||
TOTAL IMPLEMENTED | $5,768 | $2,748 |
$5,768
96,131
kWh
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs