ITAC Assessment: TN0381
ITAC logo
ITAC Assessment: TN0381
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1989
Principal Product ELECTRIC MOTORS
NAICS
n/a
SIC 3621: Motors and Generators
Sales Range $10
M
to 50
M
# of Employees 200
Plant Area
n/a
Annual Production 13,000,000
pieces
Production Hrs. Annual 7,488
hrs
Location (State) North Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $142,354 2,388,335
kWh
Fuel Oil #2 $11,000 2,660
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $46,869 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $5,768

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Administrative Changes Savings
01 2.7123: Keep lamps and reflectors clean $21,317 $21,317 $20,856
347,597
kWh
$461
02 2.7133: Use separate switches on perimeter lighting which may be turned off when natural light is available $16,038 $16,040 $16,038
267,292
kWh
-
03 2.4111: Utilize energy-efficient belts and other improved mechanisms $2,515 $1,800 $2,515
41,911
kWh
-
04 2.2511: Insulate bare equipment $2,726 $262 $2,726
45,428
kWh
-
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,846 $120 $1,846
30,774
kWh
-
06 2.7243: Improve air circulation with destratification fans / other methods $1,020 $4,820 $1,020
16,999
kWh
-
07 2.7142: Utilize higher efficiency lamps and/or ballasts $739 $528 $739
12,309
kWh
-
08 2.4312: Improve lubrication practices $668 $300 $668
11,137
kWh
-
TOTAL RECOMMENDED $46,869 $45,187 $46,408
773,447
kWh
$461
TOTAL IMPLEMENTED $5,768 $2,748 $5,768
96,131
kWh
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs