Assessment Year | 1989 |
---|---|
Principal Product | UNFINISHED PRINT CLOTH |
NAICS |
n/a
|
SIC | 2211: Broadwoven Fabric Mills, Cotton |
Sales Range | $10 M to 50M |
# of Employees | 365 |
Plant Area |
n/a
|
Annual Production | 93,000
thousand feet
|
Production Hrs. Annual | 6,000
hrs
|
Location (State) | South Carolina |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $1,438,864 | 30,868,992 |
kWh
|
$0.047 |
Coal | $54,050 | 32,192 |
MMBtu
|
$1.68 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $61,226 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Coal Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|
01 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $23,137 | $2,100 |
$23,137
492,380
kWh
|
- | - | |
02 | 2.7123: Keep lamps and reflectors clean | $20,544 | $37,163 |
$18,048
383,939
kWh
|
- | $2,496 | |
03 | 2.6121: Reduce hot water temperature to the minimum required | $2,703 | - | - |
$2,703
-
MMBtu
|
- | |
04 | 2.2163: Use minimum steam operating pressure | $1,190 | - | - |
$1,190
-
MMBtu
|
- | |
05 | 2.2135: Repair and eliminate steam leaks | $452 | $330 | - |
$452
-
MMBtu
|
- | |
06 | 2.2511: Insulate bare equipment | $483 | $757 | - |
$483
-
MMBtu
|
- | |
07 | 2.4312: Improve lubrication practices | $2,421 | $1,200 |
$2,421
51,583
kWh
|
- | - | |
08 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $8,954 | $3,952 |
$8,954
190,504
kWh
|
- | - | |
09 | 2.2136: Install / repair insulation on steam lines | $144 | $111 | - |
$144
-
MMBtu
|
- | |
10 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,198 | - |
$1,198
25,498
kWh
|
- | - | |
TOTAL RECOMMENDED | $61,226 | $45,613 |
$53,758
1,143,904
kWh
|
$4,972
-
MMBtu
|
$2,496 | ||
TOTAL IMPLEMENTED | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Coal Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs