ITAC Assessment: TN0377
ITAC logo
ITAC Assessment: TN0377
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1989
Principal Product POLYESTER & NYLON YARNS
NAICS
n/a
SIC 2269: Finishers of Textiles, Not elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 300
Plant Area
n/a
Annual Production 5,000,000
lb
Production Hrs. Annual 8,400
hrs
Location (State) Tennessee

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $995,174 21,648,007
kWh
Natural Gas $286,642 81,688
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $80,507 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $68,385

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.2136: Install / repair insulation on steam lines $25,781 $2,304 - $25,781
-
MMBtu
-
02 2.2511: Insulate bare equipment $8,728 $2,428 - $8,728
-
MMBtu
-
03 2.4111: Utilize energy-efficient belts and other improved mechanisms $19,212 - $19,212
417,644
kWh
- -
04 2.2414: Use waste heat from hot flue gases to preheat $6,433 $17,200 - $6,433
-
MMBtu
-
05 2.2135: Repair and eliminate steam leaks $3,364 $240 - $3,364
-
MMBtu
-
06 2.1233: Analyze flue gas for proper air/fuel ratio $2,146 $800 - $2,146
-
MMBtu
-
07 2.2122: Install / repair insulation on condensate lines $1,960 $200 - $1,960
-
MMBtu
-
08 2.7123: Keep lamps and reflectors clean $3,394 $11,235 $3,074
66,823
kWh
- $320
09 2.7142: Utilize higher efficiency lamps and/or ballasts $9,489 $3,870 $9,489
206,331
kWh
- -
TOTAL RECOMMENDED $80,507 $38,277 $31,775
690,798
kWh
$48,412
-
MMBtu
$320
TOTAL IMPLEMENTED $68,385 $24,614 $28,701
623,975
kWh
$39,684
-
MMBtu
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs