Assessment Year | 1989 |
---|---|
Principal Product | NYLON FIBERS |
NAICS |
n/a
|
SIC | 2281: Yarn Spinning Mills |
Sales Range | $50 M to 100M |
# of Employees | 430 |
Plant Area |
n/a
|
Annual Production | 40,000,000
lb
|
Production Hrs. Annual | 8,400
hrs
|
Location (State) | Virginia |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $1,156,378 | 26,793,963 |
kWh
|
$0.043 |
Natural Gas | $139,231 | 32,844 |
MMBtu
|
$4.24 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $224,464 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $215,592 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|
01 | 2.7123: Keep lamps and reflectors clean | $99,672 | $103,100 |
$92,112
2,142,145
kWh
|
- | $7,560 | |
02 | 2.4322: Use or replace with energy efficient substitutes | $18,992 | $33,000 | - |
$18,992
-
MMBtu
|
- | |
03 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $37,026 | $7,500 |
$37,026
861,079
kWh
|
- | - | |
04 | 2.2163: Use minimum steam operating pressure | $8,371 | - | - |
$8,371
-
MMBtu
|
- | |
05 | 2.4231: Reduce the pressure of compressed air to the minimum required | $19,811 | - |
$19,811
460,727
kWh
|
- | - | |
06 | 2.7111: Reduce illumination to minimum necessary levels | $13,951 | $240 |
$13,006
302,462
kWh
|
- | $945 | |
07 | 2.4312: Improve lubrication practices | $8,872 | $4,060 |
$8,872
206,331
kWh
|
- | - | |
08 | 2.4221: Install compressor air intakes in coolest locations | $8,431 | $1,800 |
$8,431
196,073
kWh
|
- | - | |
09 | 2.1233: Analyze flue gas for proper air/fuel ratio | $2,759 | $1,500 | - |
$2,759
-
MMBtu
|
- | |
10 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $6,579 | $4,050 |
$6,579
152,989
kWh
|
- | - | |
TOTAL RECOMMENDED | $224,464 | $155,250 |
$185,837
4,321,806
kWh
|
$30,122
-
MMBtu
|
$8,505 | ||
TOTAL IMPLEMENTED | $215,592 | $151,190 |
$176,965
4,115,475
kWh
|
$30,122
-
MMBtu
|
$8,505 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs