| Assessment Year | 1989 |
|---|---|
| Principal Product | INDUS. & COMM. LIGHTING |
| NAICS |
n/a
|
| SIC | 3646: Commercial, Industrial, and Institutional Electric Lighting Fixtures |
| Sales Range | $50 M to 100M |
| # of Employees | 290 |
| Plant Area |
n/a
|
| Annual Production | 700,000
pieces
|
| Production Hrs. Annual | 4,420
hrs
|
| Location (State) | Tennessee |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $236,556 | 4,306,858 |
kWh
|
$0.055 |
| Natural Gas | $415,249 | 99,286 |
MMBtu
|
$4.18 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $42,762 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | - | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.1233: Analyze flue gas for proper air/fuel ratio | $5,877 | - | - |
$6,177
-
MMBtu
|
$(-300.0) | |
| 02 | 2.2511: Insulate bare equipment | $4,310 | $2,994 | - |
$4,310
-
MMBtu
|
- | |
| 03 | 2.2441: Preheat boiler makeup water with waste process heat | $5,212 | $7,800 | - |
$5,212
-
MMBtu
|
- | |
| 04 | 2.2122: Install / repair insulation on condensate lines | $3,470 | $1,190 | - |
$3,470
-
MMBtu
|
- | |
| 05 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $9,946 | $1,470 |
$9,946
180,832
kWh
|
- | - | |
| 06 | 2.4324: Replace hydraulic / pneumatic equipment with electric equipment | $6,287 | $25,000 |
$6,287
114,302
kWh
|
- | - | |
| 07 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $6,013 | - |
$6,013
109,320
kWh
|
- | - | |
| 08 | 2.2136: Install / repair insulation on steam lines | $1,328 | $450 | - |
$1,328
-
MMBtu
|
- | |
| 09 | 2.1233: Analyze flue gas for proper air/fuel ratio | $319 | $360 | - |
$319
-
MMBtu
|
- | |
| TOTAL RECOMMENDED | $42,762 | $39,264 |
$22,246
404,454
kWh
|
$20,816
-
MMBtu
|
$(-300.0) | ||
| TOTAL IMPLEMENTED | - | - | - | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs