| Assessment Year | 1988 |
|---|---|
| Principal Product | PAINT APPLICATORS |
| NAICS |
n/a
|
| SIC | 3991: Brooms and Brushes |
| Sales Range | $10 M to 50M |
| # of Employees | 200 |
| Plant Area |
n/a
|
| Annual Production | 24,000,000
pieces
|
| Production Hrs. Annual | 7,488
hrs
|
| Location (State) | Tennessee |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $144,161 | 2,866,940 |
kWh
|
$0.050 |
| Natural Gas | $23,991 | 5,417 |
MMBtu
|
$4.43 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $17,210 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $16,562 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $6,565 | $415 |
$6,565
131,301
kWh
|
- | - | |
| 02 | 2.7123: Keep lamps and reflectors clean | $6,252 | $14,499 |
$6,199
123,974
kWh
|
- | $53 | |
| 03 | 2.7243: Improve air circulation with destratification fans / other methods | $135 | $5,000 |
$(-820.0)
(-16,413)
kWh
|
$955
-
MMBtu
|
- | |
| 04 | 2.6214: Shut off pilots in standby equipment | $770 | - | - |
$770
-
MMBtu
|
- | |
| 05 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $2,491 | - |
$2,491
49,824
kWh
|
- | - | |
| 06 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $513 | $270 |
$513
10,258
kWh
|
- | - | |
| 07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $484 | $294 |
$484
9,672
kWh
|
- | - | |
| TOTAL RECOMMENDED | $17,210 | $20,478 |
$15,432
308,616
kWh
|
$1,725
-
MMBtu
|
$53 | ||
| TOTAL IMPLEMENTED | $16,562 | $15,208 |
$15,739
314,771
kWh
|
$770
-
MMBtu
|
$53 | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs