ITAC Assessment: TN0340
ITAC logo
ITAC Assessment: TN0340
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1988
Principal Product BABY FOOD
NAICS
n/a
SIC 2032: Canned Specialties
Sales Range $100
M
to 500
M
# of Employees 400
Plant Area
n/a
Annual Production 17,000,000
pieces
Production Hrs. Annual 6,500
hrs
Location (State) North Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $656,108 12,427,902
kWh
Natural Gas $664,840 193,036
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $68,680 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $34,996

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.6221: Use most efficient equipment at it's maximum capacity and less efficient equipment only when necessary $24,647 - - $24,647
-
MMBtu
02 2.2511: Insulate bare equipment $11,424 $3,960 - $11,424
-
MMBtu
03 2.7243: Improve air circulation with destratification fans / other methods $7,565 $28,500 - $7,565
-
MMBtu
04 2.2136: Install / repair insulation on steam lines $7,296 $3,226 - $7,296
-
MMBtu
05 2.2135: Repair and eliminate steam leaks $3,053 $300 - $3,053
-
MMBtu
06 2.4111: Utilize energy-efficient belts and other improved mechanisms $12,194 - $12,194
230,070
kWh
-
07 2.4312: Improve lubrication practices $2,501 - $2,501
47,186
kWh
-
TOTAL RECOMMENDED $68,680 $35,986 $14,695
277,256
kWh
$53,985
-
MMBtu
TOTAL IMPLEMENTED $34,996 $3,526 - $34,996
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs