ITAC Assessment: TN0336
ITAC logo
ITAC Assessment: TN0336
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1988
Principal Product MECHANICAL OIL SEALS
NAICS
n/a
SIC 3053: Gaskets, Packing, and Sealing Devices
Sales Range $10
M
to 50
M
# of Employees 175
Plant Area
n/a
Annual Production 900,000
lb
Production Hrs. Annual 6,000
hrs
Location (State) North Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $282,430 6,099,648
kWh
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $20,411 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $11,972

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.7245: Use direct air supply to exhaust hoods $7,226 $19,980 $7,226
157,093
kWh
02 2.7243: Improve air circulation with destratification fans / other methods $4,139 $7,500 $4,139
89,977
kWh
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $4,260 $830 $4,260
92,614
kWh
04 2.4111: Utilize energy-efficient belts and other improved mechanisms $2,494 - $2,494
54,220
kWh
05 2.6122: Adjust vents to minimize energy use $890 $1,140 $890
19,343
kWh
06 2.4312: Improve lubrication practices $795 $1,650 $795
17,292
kWh
07 2.2511: Insulate bare equipment $418 $274 $418
9,086
kWh
08 2.7142: Utilize higher efficiency lamps and/or ballasts $189 $180 $189
4,103
kWh
TOTAL RECOMMENDED $20,411 $31,554 $20,411
443,728
kWh
TOTAL IMPLEMENTED $11,972 $9,650 $11,972
260,257
kWh
Yearly Savings* Imp'd Cost* Electricity Usage Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs