ITAC Assessment: TN0327
ITAC logo
ITAC Assessment: TN0327
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1987
Principal Product COSMETIC PACKAGING
NAICS
n/a
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 440
Plant Area
n/a
Annual Production 6,000,000
pieces
Production Hrs. Annual 8,736
hrs
Location (State) Tennessee

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $556,440 11,573,857
kWh
Natural Gas $12,069 2,444
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $34,159 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $19,261

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.2511: Insulate bare equipment $10,649 $470 $10,649
221,864
kWh
-
02 2.4239: Eliminate or reduce compressed air usage $8,961 $2,175 $8,961
186,694
kWh
-
03 2.7221: Lower temperature during the winter season and vice-versa $6,823 $900 $6,823
142,145
kWh
-
04 2.4312: Improve lubrication practices $4,249 $1,290 $4,249
88,511
kWh
-
05 2.6214: Shut off pilots in standby equipment $1,029 - - $1,029
-
MMBtu
06 2.4111: Utilize energy-efficient belts and other improved mechanisms $2,448 $1,200 $2,448
50,996
kWh
-
TOTAL RECOMMENDED $34,159 $6,035 $33,130
690,210
kWh
$1,029
-
MMBtu
TOTAL IMPLEMENTED $19,261 $4,275 $18,232
379,835
kWh
$1,029
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs