| Assessment Year | 1987 |
|---|---|
| Principal Product | PLASTIC COATED AUTO PART |
| NAICS |
n/a
|
| SIC | 3479: Coating, Engraving, and Allied Services, Not Elsewhere Classified |
| Sales Range | $1 M to 5M |
| # of Employees | 76 |
| Plant Area |
n/a
|
| Annual Production | 60,000,000
pieces
|
| Production Hrs. Annual | 6,240
hrs
|
| Location (State) | Tennessee |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $98,981 | 1,689,332 |
kWh
|
$0.059 |
| Natural Gas | $101,917 | 24,770 |
MMBtu
|
$4.11 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $20,629 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $16,955 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|
| 01 | 2.2136: Install / repair insulation on steam lines | $4,727 | $1,002 | - |
$4,727
-
MMBtu
|
|
| 02 | 2.2531: Re-size charging openings or add movable cover or door | $3,674 | $1,722 | - |
$3,674
-
MMBtu
|
|
| 03 | 2.2425: Use flue gases to heat process or service water | $3,428 | $8,100 | - |
$3,428
-
MMBtu
|
|
| 04 | 2.1233: Analyze flue gas for proper air/fuel ratio | $1,677 | $800 | - |
$1,677
-
MMBtu
|
|
| 05 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $4,340 | $75 |
$4,340
73,564
kWh
|
- | |
| 06 | 2.2163: Use minimum steam operating pressure | $910 | - | - |
$910
-
MMBtu
|
|
| 07 | 2.4312: Improve lubrication practices | $1,816 | - |
$1,816
30,774
kWh
|
- | |
| 08 | 2.2122: Install / repair insulation on condensate lines | $57 | $32 | - |
$57
-
MMBtu
|
|
| TOTAL RECOMMENDED | $20,629 | $11,731 |
$6,156
104,338
kWh
|
$14,473
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $16,955 | $10,009 |
$6,156
104,338
kWh
|
$10,799
-
MMBtu
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs