ITAC Assessment: TN0317
ITAC logo
ITAC Assessment: TN0317
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1987
Principal Product PLASTIC COATED AUTO PART
NAICS
n/a
SIC 3479: Coating, Engraving, and Allied Services, Not Elsewhere Classified
Sales Range $1
M
to 5
M
# of Employees 76
Plant Area
n/a
Annual Production 60,000,000
pieces
Production Hrs. Annual 6,240
hrs
Location (State) Tennessee

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $98,981 1,689,332
kWh
Natural Gas $101,917 24,770
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $20,629 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $16,955

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.2136: Install / repair insulation on steam lines $4,727 $1,002 - $4,727
-
MMBtu
02 2.2531: Re-size charging openings or add movable cover or door $3,674 $1,722 - $3,674
-
MMBtu
03 2.2425: Use flue gases to heat process or service water $3,428 $8,100 - $3,428
-
MMBtu
04 2.1233: Analyze flue gas for proper air/fuel ratio $1,677 $800 - $1,677
-
MMBtu
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $4,340 $75 $4,340
73,564
kWh
-
06 2.2163: Use minimum steam operating pressure $910 - - $910
-
MMBtu
07 2.4312: Improve lubrication practices $1,816 - $1,816
30,774
kWh
-
08 2.2122: Install / repair insulation on condensate lines $57 $32 - $57
-
MMBtu
TOTAL RECOMMENDED $20,629 $11,731 $6,156
104,338
kWh
$14,473
-
MMBtu
TOTAL IMPLEMENTED $16,955 $10,009 $6,156
104,338
kWh
$10,799
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs