ITAC Assessment: TN0305
ITAC logo
ITAC Assessment: TN0305
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1987
Principal Product PRINTER RIBBONS & PAPER
NAICS
n/a
SIC 2672: Coated and Laminated Paper, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 192
Plant Area
n/a
Annual Production 7,200,000
pieces
Production Hrs. Annual 7,488
hrs
Location (State) Tennessee

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $86,590 1,542,497
kWh
Natural Gas $8,695 1,770
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $11,573 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $6,337

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.6214: Shut off pilots in standby equipment $2,479 - - $2,479
-
MMBtu
02 2.4235: Remove or close off unneeded compressed air lines $2,347 $120 $2,347
41,911
kWh
-
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,298 $210 $2,298
41,032
kWh
-
04 2.6221: Use most efficient equipment at it's maximum capacity and less efficient equipment only when necessary $1,592 $1,315 $1,592
28,429
kWh
-
05 2.7111: Reduce illumination to minimum necessary levels $1,297 - $1,297
23,154
kWh
-
06 2.4239: Eliminate or reduce compressed air usage $1,034 $348 $1,034
18,464
kWh
-
07 2.7142: Utilize higher efficiency lamps and/or ballasts $526 $120 $526
9,086
kWh
-
TOTAL RECOMMENDED $11,573 $2,113 $9,094
162,076
kWh
$2,479
-
MMBtu
TOTAL IMPLEMENTED $6,337 $678 $3,858
68,582
kWh
$2,479
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs