ITAC Assessment: TN0297
ITAC logo
ITAC Assessment: TN0297
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1986
Principal Product PORCELAIN ENAMEL
NAICS
n/a
SIC 2899: Chemicals and Chemical Preparations, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 150
Plant Area
n/a
Annual Production 41,400,000
lb
Production Hrs. Annual 5,880
hrs
Location (State) Tennessee

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $569,347 11,645,956
kWh
Natural Gas $854,056 173,933
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $156,413 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $69,413

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.2414: Use waste heat from hot flue gases to preheat $80,968 $70,000 - $80,968
-
MMBtu
02 2.2443: Re-use or recycle hot or cold process exhaust air $42,615 $46,000 - $42,615
-
MMBtu
03 2.6221: Use most efficient equipment at it's maximum capacity and less efficient equipment only when necessary $23,107 $20,800 $23,107
471,571
kWh
-
04 2.6242: Minimize operation of equipment maintained in standby condition $6,032 $1,810 $6,032
123,095
kWh
-
05 2.2511: Insulate bare equipment $3,691 $492 $3,691
75,322
kWh
-
TOTAL RECOMMENDED $156,413 $139,102 $32,830
669,988
kWh
$123,583
-
MMBtu
TOTAL IMPLEMENTED $69,413 $67,292 $26,798
546,893
kWh
$42,615
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs