Assessment Year | 1986 |
---|---|
Principal Product | REFINED PETROLEUM PRDTS. |
NAICS |
n/a
|
SIC | 2911: Petroleum Refining |
Sales Range | $50 M to 100M |
# of Employees | 175 |
Plant Area |
n/a
|
Annual Production | 63,000
Tgal
|
Production Hrs. Annual | 8,736
hrs
|
Location (State) | Tennessee |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $126,387 | 2,763,482 |
kWh
|
$0.046 |
Natural Gas | $175,896 | 47,189 |
MMBtu
|
$3.73 |
Other Energy | $609,331 | 223,988 |
MMBtu
|
$2.72 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $252,170 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $187,685 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Other Gas Savings |
---|---|---|---|---|---|---|---|
01 | 2.2414: Use waste heat from hot flue gases to preheat | $64,485 | $105,000 | - |
$42,606
-
MMBtu
|
$21,879
-
MMBtu
|
|
02 | 2.1233: Analyze flue gas for proper air/fuel ratio | $32,373 | $4,500 | - |
$5,228
-
MMBtu
|
$27,145
-
MMBtu
|
|
03 | 2.2135: Repair and eliminate steam leaks | $11,562 | $150 | - |
$11,562
-
MMBtu
|
- | |
04 | 2.3416: Use combined cycle gas turbine generator sets with waste heat boilers connected to turbine exhaust | $143,750 | $40,000 |
$127,106
2,763,189
kWh
|
- |
$16,644
-
MMBtu
|
|
TOTAL RECOMMENDED | $252,170 | $149,650 |
$127,106
2,763,189
kWh
|
$59,396
-
MMBtu
|
$65,668
-
MMBtu
|
||
TOTAL IMPLEMENTED | $187,685 | $44,650 |
$127,106
2,763,189
kWh
|
$16,790
-
MMBtu
|
$43,789
-
MMBtu
|
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs