Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1986
Principal Product REFINED PETROLEUM PRDTS.
NAICS
n/a
SIC 2911: Petroleum Refining
Sales Range $50
M
to 100
M
# of Employees 175
Plant Area
n/a
Annual Production 63,000
Tgal
Production Hrs. Annual 8,736
hrs
Location (State) Tennessee

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $126,387 2,763,482
kWh
Natural Gas $175,896 47,189
MMBtu
Other Energy $609,331 223,988
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $252,170 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $187,685

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Other Gas Savings
01 2.2414: Use waste heat from hot flue gases to preheat $64,485 $105,000 - $42,606
-
MMBtu
$21,879
-
MMBtu
02 2.1233: Analyze flue gas for proper air/fuel ratio $32,373 $4,500 - $5,228
-
MMBtu
$27,145
-
MMBtu
03 2.2135: Repair and eliminate steam leaks $11,562 $150 - $11,562
-
MMBtu
-
04 2.3416: Use combined cycle gas turbine generator sets with waste heat boilers connected to turbine exhaust $143,750 $40,000 $127,106
2,763,189
kWh
- $16,644
-
MMBtu
TOTAL RECOMMENDED $252,170 $149,650 $127,106
2,763,189
kWh
$59,396
-
MMBtu
$65,668
-
MMBtu
TOTAL IMPLEMENTED $187,685 $44,650 $127,106
2,763,189
kWh
$16,790
-
MMBtu
$43,789
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs