ITAC Assessment: TN0266
ITAC logo
ITAC Assessment: TN0266
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1985
Principal Product SOFT DRINKS,BOTTLES&CANS
NAICS
n/a
SIC 2086: Bottled and Canned Soft Drinks and Carbonated Waters
Sales Range $10
M
to 50
M
# of Employees 425
Plant Area
n/a
Annual Production 10,000,000
pieces
Production Hrs. Annual 2,060
hrs
Location (State) Tennessee

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $214,763 4,366,940
kWh
Natural Gas $111,236 22,607
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $26,446 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $9,023

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.2437: Recover waste heat from equipment $16,052 $15,200 - $16,052
-
MMBtu
02 2.1233: Analyze flue gas for proper air/fuel ratio $2,445 $600 - $2,445
-
MMBtu
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,958 $375 $2,958
60,375
kWh
-
04 2.4231: Reduce the pressure of compressed air to the minimum required $2,054 - $2,054
41,911
kWh
-
05 2.7111: Reduce illumination to minimum necessary levels $1,077 - $1,077
21,981
kWh
-
06 2.7121: Utilize daylight whenever possible in lieu of artificial light $948 $2,300 $948
19,343
kWh
-
07 2.2511: Insulate bare equipment $294 $350 - $294
-
MMBtu
08 2.6232: Install set-back timers $618 - $618
12,603
kWh
-
TOTAL RECOMMENDED $26,446 $18,825 $7,655
156,213
kWh
$18,791
-
MMBtu
TOTAL IMPLEMENTED $9,023 $3,275 $6,578
134,232
kWh
$2,445
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs