| Assessment Year | 1985 |
|---|---|
| Principal Product | SOFT DRINKS,BOTTLES&CANS |
| NAICS |
n/a
|
| SIC | 2086: Bottled and Canned Soft Drinks and Carbonated Waters |
| Sales Range | $10 M to 50M |
| # of Employees | 425 |
| Plant Area |
n/a
|
| Annual Production | 10,000,000
pieces
|
| Production Hrs. Annual | 2,060
hrs
|
| Location (State) | Tennessee |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $214,763 | 4,366,940 |
kWh
|
$0.049 |
| Natural Gas | $111,236 | 22,607 |
MMBtu
|
$4.92 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $26,446 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $9,023 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|
| 01 | 2.2437: Recover waste heat from equipment | $16,052 | $15,200 | - |
$16,052
-
MMBtu
|
|
| 02 | 2.1233: Analyze flue gas for proper air/fuel ratio | $2,445 | $600 | - |
$2,445
-
MMBtu
|
|
| 03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $2,958 | $375 |
$2,958
60,375
kWh
|
- | |
| 04 | 2.4231: Reduce the pressure of compressed air to the minimum required | $2,054 | - |
$2,054
41,911
kWh
|
- | |
| 05 | 2.7111: Reduce illumination to minimum necessary levels | $1,077 | - |
$1,077
21,981
kWh
|
- | |
| 06 | 2.7121: Utilize daylight whenever possible in lieu of artificial light | $948 | $2,300 |
$948
19,343
kWh
|
- | |
| 07 | 2.2511: Insulate bare equipment | $294 | $350 | - |
$294
-
MMBtu
|
|
| 08 | 2.6232: Install set-back timers | $618 | - |
$618
12,603
kWh
|
- | |
| TOTAL RECOMMENDED | $26,446 | $18,825 |
$7,655
156,213
kWh
|
$18,791
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $9,023 | $3,275 |
$6,578
134,232
kWh
|
$2,445
-
MMBtu
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs