| Assessment Year | 1985 |
|---|---|
| Principal Product | LUGGAGE |
| NAICS |
n/a
|
| SIC | 3161: Luggage |
| Sales Range | $10 M to 50M |
| # of Employees | 490 |
| Plant Area |
n/a
|
| Annual Production | 400,000
pieces
|
| Production Hrs. Annual | 4,625
hrs
|
| Location (State) | Tennessee |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $87,316 | 1,556,858 |
kWh
|
$0.056 |
| Natural Gas | $16,609 | 3,277 |
MMBtu
|
$5.07 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $11,789 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $10,427 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|
| 01 | 2.7111: Reduce illumination to minimum necessary levels | $6,018 | $3,600 |
$6,762
120,750
kWh
|
$(-744.0)
-
MMBtu
|
|
| 02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $3,644 | $120 |
$3,644
65,064
kWh
|
- | |
| 03 | 2.2511: Insulate bare equipment | $765 | $1,200 |
$903
16,120
kWh
|
$(-138.0)
-
MMBtu
|
|
| 04 | 2.7228: Avoid introducing hot, humid, or dirty air into hvac system | $1,362 | $3,000 |
$1,362
24,326
kWh
|
- | |
| TOTAL RECOMMENDED | $11,789 | $7,920 |
$12,671
226,260
kWh
|
$(-882.0)
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $10,427 | $4,920 |
$11,309
201,934
kWh
|
$(-882.0)
-
MMBtu
|
||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs