ITAC Assessment: TN0256
ITAC logo
ITAC Assessment: TN0256
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1985
Principal Product LUMBER
NAICS
n/a
SIC 2421: Sawmills and Planing Mills, General
Sales Range $500
k
to 1
M
# of Employees 32
Plant Area
n/a
Annual Production 1,500
thousand feet
Production Hrs. Annual 0
hrs
Location (State) Tennessee

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $27,278 330,012
kWh
Natural Gas $21,420 3,620
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $4,937 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $1,226

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.2163: Use minimum steam operating pressure $1,546 - - $1,546
-
MMBtu
02 2.1131: Repair faulty insulation in furnaces, boilers, etc $1,103 $74 - $1,103
-
MMBtu
03 2.2136: Install / repair insulation on steam lines $1,062 $244 - $1,062
-
MMBtu
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $769 $50 $769
9,379
kWh
-
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $457 $245 $457
5,569
kWh
-
TOTAL RECOMMENDED $4,937 $613 $1,226
14,948
kWh
$3,711
-
MMBtu
TOTAL IMPLEMENTED $1,226 $295 $1,226
14,948
kWh
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs