ITAC Assessment: SF0446
ITAC logo
ITAC Assessment: SF0446
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2014
Principal Product Foam Meat Trays
NAICS 326150: Urethane and Other Foam Product (except Polystyrene) Manufacturing
SIC 3086: Plastics Foam Products
Sales Range $10
M
to 50
M
# of Employees 114
Plant Area 125,000
ft2
Annual Production 10
units
Production Hrs. Annual 8,760
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,074,998 12,801,065
kWh
Electricity Demand $539,378 24,588
kW-mo/yr
Natural Gas $63,029 8,937
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $97,506 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $37,256

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings
01 2.2135: Repair and eliminate steam leaks $3,935 $840 $3,935
44,611
kWh
- -
02 2.4111: Utilize energy-efficient belts and other improved mechanisms $477 $131 $382
4,328
kWh
$95
-
kW-mo/yr
-
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $3,568 $5,796 $3,101
35,160
kWh
$467
-
kW-mo/yr
-
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $3,787 $8,897 $3,787
42,934
kWh
- -
05 2.3311: Replace dc equipment with ac equipment $17,849 $58,975 $13,294
150,723
kWh
$4,555
-
kW-mo/yr
-
06 2.8114: Change rate schedules or other changes in utility service $56,698 $210,000 - - $56,698
07 2.7135: Install occupancy sensors $7,640 $28,695 $3,063
34,726
kWh
$4,577
-
kW-mo/yr
-
08 2.7142: Utilize higher efficiency lamps and/or ballasts $3,552 $15,048 $2,636
29,885
kWh
- $916
TOTAL RECOMMENDED $97,506 $328,382 $30,198
342,367
kWh
$9,694
-
kW-mo/yr
$57,614
TOTAL IMPLEMENTED $37,256 $103,334 $27,562
312,482
kWh
$9,694
-
kW-mo/yr
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs