Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1985
Principal Product WOVEN WIRE CLOTH
NAICS
n/a
SIC 3315: Steel Wiredrawing and Steel Nails and Spikes
Sales Range $10
M
to 50
M
# of Employees 200
Plant Area
n/a
Annual Production 30,000
thousand feet
Production Hrs. Annual 6,000
hrs
Location (State) Kentucky

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $179,589 5,578,839
kWh
Natural Gas $234,852 39,968
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $37,110 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $34,010

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.2136: Install / repair insulation on steam lines $16,970 $3,350 - $16,970
-
MMBtu
-
02 2.1233: Analyze flue gas for proper air/fuel ratio $13,100 $1,200 - $15,500
-
MMBtu
$(-2,400.0)
03 2.2511: Insulate bare equipment $3,100 $500 - $3,100
-
MMBtu
-
04 2.4322: Use or replace with energy efficient substitutes $3,940 $600 $3,940
123,095
kWh
- -
TOTAL RECOMMENDED $37,110 $5,650 $3,940
123,095
kWh
$35,570
-
MMBtu
$(-2,400.0)
TOTAL IMPLEMENTED $34,010 $5,150 $3,940
123,095
kWh
$32,470
-
MMBtu
$(-2,400.0)
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs