ITAC Assessment: TN0242
ITAC logo
ITAC Assessment: TN0242
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1985
Principal Product KNITTED FABRIC TRIMS
NAICS
n/a
SIC 2258: Lace and Warp Knit Fabric Mills
Sales Range $1
M
to 5
M
# of Employees 75
Plant Area
n/a
Annual Production 6,000
thousand feet
Production Hrs. Annual 6,864
hrs
Location (State) Tennessee

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $34,234 655,920
kWh
Natural Gas $23,117 3,709
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $13,939 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $9,427

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.2135: Repair and eliminate steam leaks $5,384 $12 $300
5,862
kWh
$5,084
-
MMBtu
02 2.2136: Install / repair insulation on steam lines $4,043 $191 $1,226
23,740
kWh
$2,817
-
MMBtu
03 2.1131: Repair faulty insulation in furnaces, boilers, etc $2,830 $400 $827
15,826
kWh
$2,003
-
MMBtu
04 2.7111: Reduce illumination to minimum necessary levels $1,569 - $1,569
30,188
kWh
-
05 2.4231: Reduce the pressure of compressed air to the minimum required $113 - $113
2,052
kWh
-
TOTAL RECOMMENDED $13,939 $603 $4,035
77,668
kWh
$9,904
-
MMBtu
TOTAL IMPLEMENTED $9,427 $203 $1,526
29,602
kWh
$7,901
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs