ITAC Assessment: TN0237
ITAC logo
ITAC Assessment: TN0237
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1984
Principal Product SANDWICH SPREADS
NAICS
n/a
SIC 2035: Pickled Fruits and Vegetables, Vegetable Sauces and Seasonings, and Salad Dressings
Sales Range $1
M
to 5
M
# of Employees 10
Plant Area
n/a
Annual Production 900,000
lb
Production Hrs. Annual 2,080
hrs
Location (State) Tennessee

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $7,516 142,145
kWh
Natural Gas $508 72
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $1,572 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.2437: Recover waste heat from equipment $1,114 $2,500 $1,114
21,102
kWh
-
02 2.7111: Reduce illumination to minimum necessary levels $402 - $402
7,620
kWh
-
03 2.2437: Recover waste heat from equipment $56 $50 - $56
-
MMBtu
TOTAL RECOMMENDED $1,572 $2,550 $1,516
28,722
kWh
$56
-
MMBtu
TOTAL IMPLEMENTED - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs