ITAC Assessment: TN0230
ITAC logo
ITAC Assessment: TN0230
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1984
Principal Product FACE BRICK
NAICS
n/a
SIC 3251: Brick and Structural Clay Tile
Sales Range $5
M
to 10
M
# of Employees 100
Plant Area
n/a
Annual Production 75,000,000
pieces
Production Hrs. Annual 4,420
hrs
Location (State) Tennessee

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $322,322 7,388,628
kWh
Natural Gas $15,827 2,936
MMBtu
Coal $358,884 199,521
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $13,526 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $3,915

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Coal Savings
01 2.2515: Use optimum thickness insulation $3,915 $11,018 - $3,915
-
MMBtu
02 2.5123: Reduce fluid flow rates $9,120 $4,000 $9,120
207,796
kWh
-
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $491 - $491
11,137
kWh
-
TOTAL RECOMMENDED $13,526 $15,018 $9,611
218,933
kWh
$3,915
-
MMBtu
TOTAL IMPLEMENTED $3,915 $11,018 - $3,915
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs