| Assessment Year | 1984 |
|---|---|
| Principal Product | FACE BRICK |
| NAICS |
n/a
|
| SIC | 3251: Brick and Structural Clay Tile |
| Sales Range | $5 M to 10M |
| # of Employees | 100 |
| Plant Area |
n/a
|
| Annual Production | 75,000,000
pieces
|
| Production Hrs. Annual | 4,420
hrs
|
| Location (State) | Tennessee |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $322,322 | 7,388,628 |
kWh
|
$0.044 |
| Natural Gas | $15,827 | 2,936 |
MMBtu
|
$5.39 |
| Coal | $358,884 | 199,521 |
MMBtu
|
$1.80 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $13,526 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $3,915 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Coal Savings |
|---|---|---|---|---|---|---|
| 01 | 2.2515: Use optimum thickness insulation | $3,915 | $11,018 | - |
$3,915
-
MMBtu
|
|
| 02 | 2.5123: Reduce fluid flow rates | $9,120 | $4,000 |
$9,120
207,796
kWh
|
- | |
| 03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $491 | - |
$491
11,137
kWh
|
- | |
| TOTAL RECOMMENDED | $13,526 | $15,018 |
$9,611
218,933
kWh
|
$3,915
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $3,915 | $11,018 | - |
$3,915
-
MMBtu
|
||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs