ITAC Assessment: TN0228
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1984
Principal Product HUMIDIFIERS, FANS, ETC.
NAICS
n/a
SIC 3564: Industrial and Commercial Fans and Blowers and Air Purification Equipment
Sales Range $10
M
to 50
M
# of Employees 400
Plant Area
n/a
Annual Production 819,500
pieces
Production Hrs. Annual 3,760
hrs
Location (State) Tennessee

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $250,748 5,251,759
kWh
Natural Gas $66,482 13,945
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $5,960 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $568

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7111: Reduce illumination to minimum necessary levels $4,347 - $4,347
91,149
kWh
-
02 2.2514: Cover open tanks $392 $500 - $392
-
MMBtu
03 2.2511: Insulate bare equipment $197 $201 - $197
-
MMBtu
04 2.2522: Isolate hot or cold equipment $568 $108 $568
12,016
kWh
-
05 2.2511: Insulate bare equipment $456 $87 $456
9,672
kWh
-
TOTAL RECOMMENDED $5,960 $896 $5,371
112,837
kWh
$589
-
MMBtu
TOTAL IMPLEMENTED $568 $108 $568
12,016
kWh
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs