ITAC Assessment: TN0219
ITAC logo
ITAC Assessment: TN0219
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1984
Principal Product RAILROAD BEARINGS,JOINTS
NAICS
n/a
SIC 3743: Railroad Equipment
Sales Range $500
k
to 1
M
# of Employees 19
Plant Area
n/a
Annual Production 0
units
Production Hrs. Annual 0
hrs
Location (State) Tennessee

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $72,359 733,294
kWh
LPG $6,969 812
MMBtu
Fuel Oil #2 $8,512 1,392
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $6,360 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings LPG Savings Fuel Oil #2 Savings
01 2.2443: Re-use or recycle hot or cold process exhaust air $2,852 $3,879 $1,292
13,189
kWh
$1,560
-
MMBtu
-
02 2.1233: Analyze flue gas for proper air/fuel ratio $1,107 $600 - - $1,107
-
MMBtu
03 3.4154: Eliminate leaks in water lines and valves $1,381 $30 $1,381
14,068
kWh
- -
04 2.7233: Use properly designed and sized hvac equipment $922 $300 $922
9,379
kWh
- -
05 2.6214: Shut off pilots in standby equipment $98 - - $98
-
MMBtu
-
TOTAL RECOMMENDED $6,360 $4,809 $3,595
36,636
kWh
$1,658
-
MMBtu
$1,107
-
MMBtu
TOTAL IMPLEMENTED - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs