| Assessment Year | 1984 |
|---|---|
| Principal Product | RAILROAD BEARINGS,JOINTS |
| NAICS |
n/a
|
| SIC | 3743: Railroad Equipment |
| Sales Range | $500 k to 1M |
| # of Employees | 19 |
| Plant Area |
n/a
|
| Annual Production | 0
units
|
| Production Hrs. Annual | 0
hrs
|
| Location (State) | Tennessee |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $72,359 | 733,294 |
kWh
|
$0.099 |
| LPG | $6,969 | 812 |
MMBtu
|
$8.58 |
| Fuel Oil #2 | $8,512 | 1,392 |
MMBtu
|
$6.11 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $6,360 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | - | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | LPG Savings | Fuel Oil #2 Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.2443: Re-use or recycle hot or cold process exhaust air | $2,852 | $3,879 |
$1,292
13,189
kWh
|
$1,560
-
MMBtu
|
- | |
| 02 | 2.1233: Analyze flue gas for proper air/fuel ratio | $1,107 | $600 | - | - |
$1,107
-
MMBtu
|
|
| 03 | 3.4154: Eliminate leaks in water lines and valves | $1,381 | $30 |
$1,381
14,068
kWh
|
- | - | |
| 04 | 2.7233: Use properly designed and sized hvac equipment | $922 | $300 |
$922
9,379
kWh
|
- | - | |
| 05 | 2.6214: Shut off pilots in standby equipment | $98 | - | - |
$98
-
MMBtu
|
- | |
| TOTAL RECOMMENDED | $6,360 | $4,809 |
$3,595
36,636
kWh
|
$1,658
-
MMBtu
|
$1,107
-
MMBtu
|
||
| TOTAL IMPLEMENTED | - | - | - | - | - | ||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs