Assessment Year | 1984 |
---|---|
Principal Product | MATTING/RUBBER PRODUCTS |
NAICS |
n/a
|
SIC | 3069: Fabricated Rubber Products, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 198 |
Plant Area |
n/a
|
Annual Production | 30,000,000
lb
|
Production Hrs. Annual | 7,488
hrs
|
Location (State) | Tennessee |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $291,546 | 5,206,038 |
kWh
|
$0.056 |
Natural Gas | $552,027 | 112,469 |
MMBtu
|
$4.91 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $127,758 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $66,011 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|
01 | 2.2441: Preheat boiler makeup water with waste process heat | $51,259 | $42,740 | - |
$51,259
-
MMBtu
|
- | |
02 | 2.2136: Install / repair insulation on steam lines | $24,926 | $1,300 | - |
$24,926
-
MMBtu
|
- | |
03 | 2.2135: Repair and eliminate steam leaks | $22,604 | $1,425 | - |
$22,604
-
MMBtu
|
- | |
04 | 2.1233: Analyze flue gas for proper air/fuel ratio | $12,424 | $1,200 | - |
$13,624
-
MMBtu
|
$(-1,200.0) | |
05 | 2.6212: Turn off equipment during breaks, reduce operating time | $10,488 | - |
$10,488
187,573
kWh
|
- | - | |
06 | 2.7111: Reduce illumination to minimum necessary levels | $3,447 | - |
$3,447
61,547
kWh
|
- | - | |
07 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $2,610 | $50 |
$2,610
46,600
kWh
|
- | - | |
TOTAL RECOMMENDED | $127,758 | $46,715 |
$16,545
295,720
kWh
|
$112,413
-
MMBtu
|
$(-1,200.0) | ||
TOTAL IMPLEMENTED | $66,011 | $3,975 |
$6,057
108,147
kWh
|
$61,154
-
MMBtu
|
$(-1,200.0) | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs