ITAC Assessment: TN0212
ITAC logo
ITAC Assessment: TN0212
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1984
Principal Product ROADWAY ASPHALT
NAICS
n/a
SIC 2951: Asphalt Paving Mixtures and Blocks
Sales Range $1
M
to 5
M
# of Employees 45
Plant Area
n/a
Annual Production 56,690
ton
Production Hrs. Annual 2,080
hrs
Location (State) Tennessee

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $22,795 276,084
kWh
Natural Gas $102,250 22,624
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $25,449 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $13,537

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Natural Gas Savings Administrative Changes Savings
01 2.1233: Analyze flue gas for proper air/fuel ratio $9,487 $400 $10,687
-
MMBtu
$(-1,200.0)
02 2.7228: Avoid introducing hot, humid, or dirty air into hvac system $6,363 $10,000 $6,363
-
MMBtu
-
03 2.1123: Install automatic stack damper $2,822 $1,240 $2,822
-
MMBtu
-
04 2.2424: Use heat in flue gases to preheat products or materials $2,727 $10,200 $2,727
-
MMBtu
-
05 2.1233: Analyze flue gas for proper air/fuel ratio $2,547 $500 $2,547
-
MMBtu
-
06 2.2511: Insulate bare equipment $1,503 $498 $1,503
-
MMBtu
-
TOTAL RECOMMENDED $25,449 $22,838 $26,649
-
MMBtu
$(-1,200.0)
TOTAL IMPLEMENTED $13,537 $1,398 $14,737
-
MMBtu
$(-1,200.0)
Yearly Savings* Imp'd Cost* Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs