ITAC Assessment: TN0210
ITAC logo
ITAC Assessment: TN0210
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1984
Principal Product MOULDING COMPOUNDS
NAICS
n/a
SIC 2821: Plastics Materials, Synthetic Resins, and Nonvulcanizable Elastomers
Sales Range $500
k
to 1
M
# of Employees 10
Plant Area
n/a
Annual Production 700,000
lb
Production Hrs. Annual 2,000
hrs
Location (State) Tennessee

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $27,939 430,832
kWh
Natural Gas $22,049 4,291
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $7,715 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $6,836

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.1233: Analyze flue gas for proper air/fuel ratio $3,637 $100 - $3,937
-
MMBtu
$(-300.0)
02 2.2136: Install / repair insulation on steam lines $2,764 $2,000 - $2,764
-
MMBtu
-
03 2.7142: Utilize higher efficiency lamps and/or ballasts $879 $2,780 $879
21,981
kWh
- -
04 2.2122: Install / repair insulation on condensate lines $189 $70 - $189
-
MMBtu
-
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $246 $20 $246
6,155
kWh
- -
TOTAL RECOMMENDED $7,715 $4,970 $1,125
28,136
kWh
$6,890
-
MMBtu
$(-300.0)
TOTAL IMPLEMENTED $6,836 $2,190 $246
6,155
kWh
$6,890
-
MMBtu
$(-300.0)
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs