ITAC Assessment: TN0209
ITAC logo
ITAC Assessment: TN0209
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1984
Principal Product ROUGH SAW LUMBER
NAICS
n/a
SIC 2421: Sawmills and Planing Mills, General
Sales Range less than $500
k
# of Employees 9
Plant Area
n/a
Annual Production 1,100
thousand feet
Production Hrs. Annual 2,210
hrs
Location (State) Tennessee

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $2,316 36,928
kWh
Wood $23 74
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $282 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $282

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.4312: Improve lubrication practices $117 - $117
2,931
kWh
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $106 $50 $106
2,638
kWh
03 2.6121: Reduce hot water temperature to the minimum required $59 $215 $59
879
kWh
TOTAL RECOMMENDED $282 $265 $282
6,448
kWh
TOTAL IMPLEMENTED $282 $265 $282
6,448
kWh
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs