ITAC Assessment: TN0208
ITAC logo
ITAC Assessment: TN0208
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1984
Principal Product MEDICAL TELEMETRY SYSTEM
NAICS
n/a
SIC 3829: Measuring and Controlling Devices, Not Elsewhere Classified
Sales Range $1
M
to 5
M
# of Employees 21
Plant Area
n/a
Annual Production 100
pieces
Production Hrs. Annual 0
hrs
Location (State) Tennessee

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $14,283 264,068
kWh
Natural Gas $3,072 516
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $3,559 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7229: Air condition only space necessary $2,708 $132 $1,208
30,188
kWh
$1,500
-
MMBtu
02 2.7494: Install storm windows and doors $731 $123 $141
3,517
kWh
$590
-
MMBtu
03 2.6214: Shut off pilots in standby equipment $120 $10 - $120
-
MMBtu
TOTAL RECOMMENDED $3,559 $265 $1,349
33,705
kWh
$2,210
-
MMBtu
TOTAL IMPLEMENTED - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs