Assessment Year | 1984 |
---|---|
Principal Product | AUTO A/C & EVAPORATORS |
NAICS |
n/a
|
SIC | 3585: Air-Conditioning and Warm Air Heating Equipment and Commercial and Industrial Refrigeration Equipment |
Sales Range | $10 M to 50M |
# of Employees | 435 |
Plant Area |
n/a
|
Annual Production | 1,200,000
pieces
|
Production Hrs. Annual | 0
hrs
|
Location (State) | Tennessee |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $262,557 | 5,482,708 |
kWh
|
$0.048 |
Natural Gas | $332,517 | 66,450 |
MMBtu
|
$5.00 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $83,584 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $61,664 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
---|---|---|---|---|---|---|
01 | 2.2444: Use hot process fluids to preheat incoming process fluids | $49,685 | $7,200 | - |
$49,685
-
MMBtu
|
|
02 | 2.6218: Turn off equipment when not in use | $21,920 | - | - |
$21,920
-
MMBtu
|
|
03 | 2.6122: Adjust vents to minimize energy use | $7,310 | $20,000 | - |
$7,310
-
MMBtu
|
|
04 | 2.2511: Insulate bare equipment | $2,840 | $232 |
$2,840
94,666
kWh
|
- | |
05 | 2.7111: Reduce illumination to minimum necessary levels | $1,679 | - |
$1,679
55,979
kWh
|
- | |
06 | 2.1233: Analyze flue gas for proper air/fuel ratio | $150 | $200 | - |
$150
-
MMBtu
|
|
TOTAL RECOMMENDED | $83,584 | $27,632 |
$4,519
150,645
kWh
|
$79,065
-
MMBtu
|
||
TOTAL IMPLEMENTED | $61,664 | $27,632 |
$4,519
150,645
kWh
|
$57,145
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs