ITAC Assessment: TN0203
ITAC logo
ITAC Assessment: TN0203
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1984
Principal Product AUTO A/C & EVAPORATORS
NAICS
n/a
SIC 3585: Air-Conditioning and Warm Air Heating Equipment and Commercial and Industrial Refrigeration Equipment
Sales Range $10
M
to 50
M
# of Employees 435
Plant Area
n/a
Annual Production 1,200,000
pieces
Production Hrs. Annual 0
hrs
Location (State) Tennessee

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $262,557 5,482,708
kWh
Natural Gas $332,517 66,450
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $83,584 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $61,664

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.2444: Use hot process fluids to preheat incoming process fluids $49,685 $7,200 - $49,685
-
MMBtu
02 2.6218: Turn off equipment when not in use $21,920 - - $21,920
-
MMBtu
03 2.6122: Adjust vents to minimize energy use $7,310 $20,000 - $7,310
-
MMBtu
04 2.2511: Insulate bare equipment $2,840 $232 $2,840
94,666
kWh
-
05 2.7111: Reduce illumination to minimum necessary levels $1,679 - $1,679
55,979
kWh
-
06 2.1233: Analyze flue gas for proper air/fuel ratio $150 $200 - $150
-
MMBtu
TOTAL RECOMMENDED $83,584 $27,632 $4,519
150,645
kWh
$79,065
-
MMBtu
TOTAL IMPLEMENTED $61,664 $27,632 $4,519
150,645
kWh
$57,145
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs