ITAC Assessment: TN0192
ITAC logo
ITAC Assessment: TN0192
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1983
Principal Product CHICKEN
NAICS
n/a
SIC 2015: Poultry Slaughtering and Processing
Sales Range $10
M
to 50
M
# of Employees 200
Plant Area
n/a
Annual Production 20,000,000
pieces
Production Hrs. Annual 2,000
hrs
Location (State) Tennessee

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $145,052 3,205,744
kWh
Natural Gas $118,132 22,860
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $8,505 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $8,065

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.1233: Analyze flue gas for proper air/fuel ratio $6,800 - - $6,800
-
MMBtu
02 2.2511: Insulate bare equipment $325 $12,000 - $325
-
MMBtu
03 2.2136: Install / repair insulation on steam lines $940 $200 - $940
-
MMBtu
04 2.7142: Utilize higher efficiency lamps and/or ballasts $440 $900 $440
8,499
kWh
-
TOTAL RECOMMENDED $8,505 $13,100 $440
8,499
kWh
$8,065
-
MMBtu
TOTAL IMPLEMENTED $8,065 $12,200 - $8,065
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs