ITAC Assessment: TN0177
ITAC logo
ITAC Assessment: TN0177
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1983
Principal Product PACKAGED MILK AND FRUIT
NAICS
n/a
SIC 2026: Fluid Milk
Sales Range $5
M
to 10
M
# of Employees 19
Plant Area
n/a
Annual Production 34,000,000
lb
Production Hrs. Annual 2,080
hrs
Location (State) Tennessee

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $47,045 1,011,723
kWh
Fuel Oil #1 $61,000 9,246
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $18,220 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $11,165

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Fuel Oil #1 Savings Administrative Changes Savings
01 2.2136: Install / repair insulation on steam lines $7,055 $1,170 $7,055
-
MMBtu
-
02 2.1233: Analyze flue gas for proper air/fuel ratio $8,540 $400 $8,940
-
MMBtu
$(-400.0)
03 2.2163: Use minimum steam operating pressure $2,625 $400 $2,625
-
MMBtu
-
TOTAL RECOMMENDED $18,220 $1,970 $18,620
-
MMBtu
$(-400.0)
TOTAL IMPLEMENTED $11,165 $800 $11,565
-
MMBtu
$(-400.0)
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs