ITAC Assessment: MS0230
ITAC logo
ITAC Assessment: MS0230
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2003
Principal Product Investment castings
NAICS 331512: Steel Investment Foundries
SIC 3324: Steel Investment Foundries
Sales Range $1
M
to 5
M
# of Employees 23
Plant Area 30,000
ft2
Annual Production 200,000
pieces
Production Hrs. Annual 2,080
hrs
Location (State) Mississippi

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $67,998 1,868,080
kWh
Electricity Demand $109,611 9,842
kW-mo/yr
Electricity Fees $11,132 -
Natural Gas $58,437 11,125
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $65,712 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $8,165

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Solid Waste (non-haz) Savings
01 2.3131: Reschedule plant operations or reduce load to avoid peaks $48,240 $31,484 - $45,084
-
kW-mo/yr
$3,156 - -
02 2.8121: Apply for tax-free status for energy purchases $7,927 $50 - - $7,927 - -
03 3.5221: Recycle casting sand $6,972 - - - - - $6,972
-
lb
04 2.7134: Use photocell controls $864 $334 $807
22,180
kWh
- $57 - -
05 2.2414: Use waste heat from hot flue gases to preheat $724 $1,800 - - - $724
-
MMBtu
-
06 2.4111: Utilize energy-efficient belts and other improved mechanisms $514 $1,080 $168
4,630
kWh
$312
-
kW-mo/yr
$34 - -
07 2.2135: Repair and eliminate steam leaks $238 $62 - - - $238
-
MMBtu
-
08 2.2414: Use waste heat from hot flue gases to preheat $233 $602 - - - $233
-
MMBtu
-
TOTAL RECOMMENDED $65,712 $35,412 $975
26,810
kWh
$45,396
-
kW-mo/yr
$11,174 $1,195
-
MMBtu
$6,972
-
lb
TOTAL IMPLEMENTED $8,165 $112 - - $7,927 $238
-
MMBtu
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Solid Waste (non-haz) Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs