ITAC Assessment: TN0171
ITAC logo
ITAC Assessment: TN0171
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1983
Principal Product VENDING MACHINES
NAICS
n/a
SIC 3581: Automatic Vending Machines
Sales Range $50
M
to 100
M
# of Employees 750
Plant Area
n/a
Annual Production 50,000
pieces
Production Hrs. Annual 0
hrs
Location (State) Tennessee

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $193,246 4,019,050
kWh
Natural Gas $288,077 63,942
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $31,800 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Natural Gas Savings
01 2.4322: Use or replace with energy efficient substitutes $23,000 $13,000 $23,000
-
MMBtu
02 2.7312: Minimize use of outside make-up air for ventilation except when used for economizer cycle $5,000 - $5,000
-
MMBtu
03 2.2136: Install / repair insulation on steam lines $3,800 $400 $3,800
-
MMBtu
TOTAL RECOMMENDED $31,800 $13,400 $31,800
-
MMBtu
TOTAL IMPLEMENTED - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs