ITAC Assessment: TN0151
ITAC logo
ITAC Assessment: TN0151
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1982
Principal Product SOCKS
NAICS
n/a
SIC 2252: Hosiery, Not Elsewhere Classified
Sales Range n/a
# of Employees 160
Plant Area
n/a
Annual Production 600,000
pieces
Production Hrs. Annual 2,376
hrs
Location (State) Tennessee

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $78,568 1,635,111
kWh
Natural Gas $65,480 14,809
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $4,950 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.2136: Install / repair insulation on steam lines $3,090 $650 - $3,090
-
MMBtu
02 2.2511: Insulate bare equipment $260 $100 - $260
-
MMBtu
03 2.7142: Utilize higher efficiency lamps and/or ballasts $1,600 $2,200 $1,600
39,859
kWh
-
TOTAL RECOMMENDED $4,950 $2,950 $1,600
39,859
kWh
$3,350
-
MMBtu
TOTAL IMPLEMENTED - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs