Assessment Year | 1982 |
---|---|
Principal Product | PHARMACEUTICALS |
NAICS |
n/a
|
SIC | 2834: Pharmaceutical Preparations |
Sales Range | $10 M to 50M |
# of Employees | 260 |
Plant Area |
n/a
|
Annual Production | 84,000,000
pieces
|
Production Hrs. Annual | 8,736
hrs
|
Location (State) | Tennessee |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $205,084 | 4,847,011 |
kWh
|
$0.042 |
Natural Gas | $27,314 | 7,295 |
MMBtu
|
$3.74 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $3,317 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
---|---|---|---|---|---|---|
01 | 2.7121: Utilize daylight whenever possible in lieu of artificial light | $811 | $1,275 |
$811
26,964
kWh
|
- | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $582 | $3,700 |
$582
19,343
kWh
|
- | |
03 | 2.7111: Reduce illumination to minimum necessary levels | $314 | - |
$314
10,551
kWh
|
- | |
04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $187 | - |
$187
6,155
kWh
|
- | |
05 | 2.2136: Install / repair insulation on steam lines | $1,423 | $464 | - |
$1,423
-
MMBtu
|
|
TOTAL RECOMMENDED | $3,317 | $5,439 |
$1,894
63,013
kWh
|
$1,423
-
MMBtu
|
||
TOTAL IMPLEMENTED | - | - | - | - |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs