ITAC Assessment: TN0143
ITAC logo
ITAC Assessment: TN0143
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1982
Principal Product PHARMACEUTICALS
NAICS
n/a
SIC 2834: Pharmaceutical Preparations
Sales Range $10
M
to 50
M
# of Employees 260
Plant Area
n/a
Annual Production 84,000,000
pieces
Production Hrs. Annual 8,736
hrs
Location (State) Tennessee

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $205,084 4,847,011
kWh
Natural Gas $27,314 7,295
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $3,317 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7121: Utilize daylight whenever possible in lieu of artificial light $811 $1,275 $811
26,964
kWh
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $582 $3,700 $582
19,343
kWh
-
03 2.7111: Reduce illumination to minimum necessary levels $314 - $314
10,551
kWh
-
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $187 - $187
6,155
kWh
-
05 2.2136: Install / repair insulation on steam lines $1,423 $464 - $1,423
-
MMBtu
TOTAL RECOMMENDED $3,317 $5,439 $1,894
63,013
kWh
$1,423
-
MMBtu
TOTAL IMPLEMENTED - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs