ITAC Assessment: TN0133
ITAC logo
ITAC Assessment: TN0133
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1982
Principal Product MOLDED BUTTONS
NAICS
n/a
SIC 3965: Fasteners, Buttons, Needles, and Pins
Sales Range $1
M
to 5
M
# of Employees 45
Plant Area
n/a
Annual Production 2,200,000
pieces
Production Hrs. Annual 4,160
hrs
Location (State) Tennessee

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $29,260 576,788
kWh
Natural Gas $37,808 10,712
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $13,276 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.1233: Analyze flue gas for proper air/fuel ratio $7,497 $100 - $7,497
-
MMBtu
02 2.2136: Install / repair insulation on steam lines $4,475 $570 - $4,475
-
MMBtu
03 2.2212: Use minimum safe oven ventilation $996 - $996
19,930
kWh
-
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $308 - $308
6,155
kWh
-
TOTAL RECOMMENDED $13,276 $670 $1,304
26,085
kWh
$11,972
-
MMBtu
TOTAL IMPLEMENTED - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs