ITAC Assessment: TN0129
ITAC logo
ITAC Assessment: TN0129
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1982
Principal Product WOOD FURNITURE
NAICS
n/a
SIC 2511: Wood Household Furniture, Except Upholstered
Sales Range $10
M
to 50
M
# of Employees 377
Plant Area
n/a
Annual Production 85,000
pieces
Production Hrs. Annual 4,000
hrs
Location (State) Tennessee

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $228,768 4,620,164
kWh
Coal $60,791 38,559
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $25,627 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Coal Savings
01 2.6212: Turn off equipment during breaks, reduce operating time $19,550 $11,600 $19,550
390,973
kWh
-
02 2.2511: Insulate bare equipment $2,797 $3,200 - $2,797
-
MMBtu
03 2.1233: Analyze flue gas for proper air/fuel ratio $2,972 $5,000 - $2,972
-
MMBtu
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $308 - $308
6,155
kWh
-
TOTAL RECOMMENDED $25,627 $19,800 $19,858
397,128
kWh
$5,769
-
MMBtu
TOTAL IMPLEMENTED - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs