ITAC Assessment: TN0117
ITAC logo
ITAC Assessment: TN0117
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1982
Principal Product DAIRY PRODUCTS
NAICS
n/a
SIC 2026: Fluid Milk
Sales Range $10
M
to 50
M
# of Employees 165
Plant Area
n/a
Annual Production 102,000,000
lb
Production Hrs. Annual 6,864
hrs
Location (State) Tennessee

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $293,761 7,859,027
kWh
Natural Gas $106,975 33,092
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $29,917 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.1233: Analyze flue gas for proper air/fuel ratio $4,898 $75 - $4,898
-
MMBtu
02 2.3212: Optimize plant power factor $15,840 $13,800 $15,840
-
kWh
-
03 2.2437: Recover waste heat from equipment $7,344 $5,000 - $7,344
-
MMBtu
04 2.7142: Utilize higher efficiency lamps and/or ballasts $1,835 $776 $1,835
38,687
kWh
-
TOTAL RECOMMENDED $29,917 $19,651 $17,675
38,687
kWh
$12,242
-
MMBtu
TOTAL IMPLEMENTED - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs