ITAC Assessment: TA0112
ITAC logo
ITAC Assessment: TA0112
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2006
Principal Product Misc. plastic parts
NAICS 333511: Industrial Mold Manufacturing
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 50
Plant Area 40,000
ft2
Annual Production 7,770,000
pieces
Production Hrs. Annual 5,856
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $133,537 1,894,896
kWh
Electricity Demand $30,346 5,390
kW-mo/yr
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $27,614 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $1,463 $792 $1,262
17,392
kWh
$201
-
kW-mo/yr
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $3,372 $3,492 $2,889
39,825
kWh
$483
-
kW-mo/yr
-
03 4.441: Install automatic packing equipment $4,082 $7,614 - - $4,082
04 2.7142: Utilize higher efficiency lamps and/or ballasts $730 $755 $490
6,720
kWh
$240
-
kW-mo/yr
-
05 2.2511: Insulate bare equipment $17,967 $1,359 $17,967
247,655
kWh
- -
TOTAL RECOMMENDED $27,614 $14,012 $22,608
311,592
kWh
$924
-
kW-mo/yr
$4,082
TOTAL IMPLEMENTED - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs