Assessment Year | 2005 |
---|---|
Principal Product | Wooden Support systems |
NAICS | 321214: Truss Manufacturing |
SIC | 2439: Structural Wood Members, Not Elsewhere Classified |
Sales Range | $50 M to 100M |
# of Employees | 170 |
Plant Area |
40,000
ft2
|
Annual Production | 15,000,000
thousand feet
|
Production Hrs. Annual | 6,120
hrs
|
Location (State) | Texas |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $48,953 | 761,760 |
kWh
|
$0.064 |
Electricity Demand | $12,227 | 2,111 |
kW-mo/yr
|
$5.79 |
Natural Gas | $6,683 | 823 |
MMBtu
|
$8.13 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $10,690 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $3,980 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Solid Waste (non-haz) Savings |
---|---|---|---|---|---|---|---|
01 | 2.4231: Reduce the pressure of compressed air to the minimum required | $3,725 | - |
$3,210
51,072
kWh
|
$515
-
kW-mo/yr
|
- | |
02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $3,320 | $460 |
$2,860
45,560
kWh
|
$460
-
kW-mo/yr
|
- | |
03 | 3.5248: Separate and recycle scrap metal to foundry or for sale | $1,600 | - | - | - |
$1,600
-
lb
|
|
04 | 2.4239: Eliminate or reduce compressed air usage | $473 | - |
$211
3,360
kWh
|
$262
-
kW-mo/yr
|
- | |
05 | 2.7121: Utilize daylight whenever possible in lieu of artificial light | $1,385 | - |
$1,385
22,060
kWh
|
- | - | |
06 | 2.7124: Make a practice of turning off lights when not needed | $187 | - |
$150
2,190
kWh
|
$37
-
kW-mo/yr
|
- | |
TOTAL RECOMMENDED | $10,690 | $460 |
$7,816
124,242
kWh
|
$1,274
-
kW-mo/yr
|
$1,600
-
lb
|
||
TOTAL IMPLEMENTED | $3,980 | $460 |
$3,221
51,110
kWh
|
$759
-
kW-mo/yr
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Solid Waste (non-haz) Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs